Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System

Minimum Order Quantity : 60 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 10000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Heavy duty climbing formwork system

Detail Information

Product Name: Jumping Formwork System Material: Q235 Steel, Bended Profile,steel Panel
Color: Blue Lacquer, Brown, Light Yellow Size: 220KN Per Bracket
Application: Dam , Bridge Abutment Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
High Light:

Bridge Abutment Construction Jump Formwork System

,

Dam Construction Jump Formwork System

Product Description

 

Dam And Bridge Abutment Construction Jumping Formwork System

 

 

Description

 

The characteristics of high bridge piers are the height of the pier, the high center of gravity, the small cross-sectional area relative to the height of the pier, the flexibility of the pier, the high requirements for construction accuracy, the difficult axis control, and the high requirements for construction joint treatment.

 

The climbing formwork construction method not only saves construction materials, the construction speed is fast, but also the concrete surface is smooth and beautiful. It is currently the most advantageous construction method in the construction of high piers.


Elements
• Title back formwork unit could be timber beam large size formwork or steel formwork 

• Triangle brackets bearing concrete pressure

• Panel travelling unit is option if reinforcement installation space is required

• Anchoring system 20.0 with high loadability

 

Features
•Main platform is 1.70 m wide for safe operation

• Formwork is title back or 600mm retraction space is also possible 

• 3 levels of platform provide space for concrete pouring, formwork operation and concrete surface repairing

• Max. permitted pull force is 200kN per bracket for embedded tie rod

 

Climbing Formwork Installation Process

 

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System 0

 

Packing

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System 1

 

Applications Field

 

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System 2

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris