Auto Climbing Formwork System For High Rise Building

Product Details:
Place of Origin: Shanghai
Brand Name: ForPro
Certification: ISO and CE
Model Number: SCF60
Payment & Shipping Terms:
Minimum Order Quantity: 20 pcs
Price: $6000-6500/pcs
Packaging Details: Pallet
Delivery Time: 30-45 Work days
Payment Terms: L/C, T/T
Supply Ability: 1000 pcs/Year

Detail Information

Material: Q235 Steel,Hot Galvanizing, Wood,PP Plastic,Timber Beam H20 Color: Green,Blue,Yellow,customized
Application: Concrete Construction,Dam,Pier,bridge,Tall Building Hight: 4.0m,4.5m,5m Etc.
Brand Name:: ForPro Port: Shanghai
High Light:

self climbing system

,

automatic climbing system

,

High Rise Building Climbing Formwork System

Product Description

 

Stable Hydraulic Climbing formwork For High Building Concrete and Bridge Construction

 

 

Outline

Self climbing formwork is a cantilever climbing formwork system integrated by formwork and multi-level working platform.
It is a crane-independent  climbing formwork for structures of any shape and inclination. It can be widely applied in high pier, housing construction and other tall structures.
It offers you speedy repositioning and less work during concreting procedure. Even with irregular layouts, formwork and brackets can be hydraulic lifted to new postion quickly and safely, it is not only save construction time, but also enhance site safety.

 

Sketch of Automatical climbing formwork

 

Auto Climbing Formwork System For High Rise Building 0

 

 

Elements

• ForPro large size timber beam formwork

• Climbing bracket

• Self climber

• Hydraulic system

• Anchoring system

 

Main Features

Work regardless of weather with complete enclosed platform
Reliable bracket structure and anchoring system
Modular design concept, can be resued in other projects
Around one hours of climbing procedure , construction cycle is 4 to 5 days per step
• Muti-platform design allows simultaneous work on different levels
• Easy operation by central controller board, therefore only a few workers required

 

 

Applications

1. Bridge pier

2. LNG

3. Super high-rise building

4. Shiplock

5. TV towers etc.

Auto Climbing Formwork System For High Rise Building 1

 

Our Services
1. Analysis the bidding inviation documents and provide professional advice consultation and formwork planning.
2. Provide formwork tendering solution and preliminary layout supply&demand.
3. Choose a best propasal to help our clients to bid for the project.
4. Start to design formwork detailedly according to the winning bidding.
5. Provide shop and assembly drawings of the formwork, gives on-site advice and continuous support service.

 

Get in touch with us

Enter Your Message

aidy.liu@forprosh.com
+8618280345525
8618011399169
shinenic.doris