Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 1000 Pcs / year |
Place of Origin: | shanghai | Brand Name: | Forpro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Modular climbing formwork system |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Blue, Yellow |
---|---|---|---|
Size: | 50KN Per Bracket | Application: | High Verticle Structure, Shiplock, Pylon Legs, High Piers |
Product Name: | Climbing Formwork CF240 System | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
High Light: | crane climbing formwork,climbing scaffolding system |
Product Description
Climbing Formwork System for Universal Application to Construct High-rise Building
Description
As a high load bearing capacity, climbing formwork can be widely utilized in various projects as high piers, abutment, elevator testing tower and high-rise structures. it is designed for precise and convienient operation for all high-rise projects, 2.40m wide platform in comibination movable formwork unit ensure speedy and safe formwork operation. Multi level platforms provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.
Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork
• Climbing brackets incude horzontal profile and verticel profile
• Panel travelling unit can trave formwork 650mm away from concrete
• Anchoring system D20.0 with high loadability
Features
• Main Platform is 2.40 wide for safe operation
• Formwork 650mm retraction space for easy cleaning
• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150
• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.
Climbing Formwork Installation Process
Applications Field
Forpro Service
Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.
3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.
Factory
FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.
Q 2.Do you have strong techinicans teams?
Yes,We have 23 technical engineers with more than 20 years experience
Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.
Q 4. What is your production capacity?
3000Tons per month.
Q 5. Do you have test report?
Yes, we have done many test by TUV Rheinland(Shanghai) Co.,Ltd.
Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.
Enter Your Message