Product Details:
|
|
Place of Origin: | Shanghai |
---|---|
Brand Name: | ForPro |
Certification: | ISO and CE |
Model Number: | SCF60 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 20 pcs |
Price: | $6000-6500/pcs |
Packaging Details: | Pallet |
Delivery Time: | 30-45 Work days |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 pcs/Year |
Detail Information |
|||
Material: | Q235 Steel,Hot Galvanizing, Wood,PP Plastic,Timber Beam H20 | Color: | Green,Blue,Yellow,customized |
---|---|---|---|
Application: | Concrete Construction,Dam,Pier,bridge,Tall Building | Hight: | 4.0m,4.5m,5m Etc. |
Brand Name:: | ForPro | Port: | Shanghai |
High Light: | self climbing system,automatic climbing system,High Rise Building Climbing Formwork System |
Product Description
Stable Hydraulic Climbing formwork For High Building Concrete and Bridge Construction
Outline
Self climbing formwork is a cantilever climbing formwork system integrated by formwork and multi-level working platform.
It is a crane-independent climbing formwork for structures of any shape and inclination. It can be widely applied in high pier, housing construction and other tall structures.It offers you speedy repositioning and less work during concreting procedure. Even with irregular layouts, formwork and brackets can be hydraulic lifted to new postion quickly and safely, it is not only save construction time, but also enhance site safety.
Sketch of Automatical climbing formwork
Elements
• ForPro large size timber beam formwork
• Climbing bracket
• Self climber
• Hydraulic system
• Anchoring system
Main Features
• Work regardless of weather with complete enclosed platform
• Reliable bracket structure and anchoring system
• Modular design concept, can be resued in other projects
• Around one hours of climbing procedure , construction cycle is 4 to 5 days per step
• Muti-platform design allows simultaneous work on different levels
• Easy operation by central controller board, therefore only a few workers required
Applications
1. Bridge pier
2. LNG
3. Super high-rise building
4. Shiplock
5. TV towers etc.
Our Services
1. Analysis the bidding inviation documents and provide professional advice consultation and formwork planning.
2. Provide formwork tendering solution and preliminary layout supply&demand.
3. Choose a best propasal to help our clients to bid for the project.
4. Start to design formwork detailedly according to the winning bidding.
5. Provide shop and assembly drawings of the formwork, gives on-site advice and continuous support service.