Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Modular Automatic Climbing Formwork , Auto Climbing System For High Rise Building

Minimum Order Quantity : 20 pcs Price : $6000-6500/pcs
Packaging Details : Pallet Delivery Time : 30-45 Work days
Payment Terms : L/C, T/T Supply Ability : 1000 pcs/Year
Place of Origin: Shanghai Brand Name: ForPro
Certification: ISO and CE Model Number: SCF60

Detail Information

Material: Q235 Steel,Hot Galvanizing, Wood,PP Plastic,Timber Beam H20 Color: Green,Blue,Yellow,customized
Application: Wall,Dam,Pier,Bridge Size: Project Drawing,Standard Or Customized
Type: Self-climbing,independant Of Crane Power: Hydraulic System
High Light:

self climbing system

,

automatic climbing system

Product Description

 

Hydraulic Automatic Climbing Formwork System independant of Crane for Concreting

 

 

Product definiation

 

The hydraulic automatic climbing formwork system is driveded by the hydraulic system, which includes cylinder and hydraulic unit. 10climbing brackets together with formwork panels could be automatically lifted to new position one time. Climbing procedure is stable and safe, Cranes is not needed during the climbing process. It is widely utilised in  high-rise buildings, towers, dams, piers and pylons projects etc. It is the idea formwork system for the majority of climbing task.

Modular Automatic Climbing Formwork , Auto Climbing System For High Rise Building 0

 

 

Component

 

ForPro large size timber beam formwork

   Include high quality plywood/Timber beam/steel waler/walerclamp/lifting bracket.

Climbing bracket

   Include Horizontal bracket/ vertical profile/ diagonal strut/ vertical Waling/ panel/

  Travelling unit/suspension platform/top platform/ Walerhook bolt

Hydraulic system

   Include hydraulic cylinder, hydraulic oil line, hydraulic hose connector and hydraulic unit

Anchoring system: High strength screw/ climbing cone/ position cone/ embedded anchor rod/sealing sleeve.

 

Technical Specification

 

Max. pouring height can reach to 6m;

Max. lifting capacity reach to 60KN;

Climbing speed can reach to 0.2m/min;

Main platform width up to 2.3m, provides sufficient space for formwork retraction up to 700mm and easy for formwork cleaning;

Min. concrete strength requirement of anchor point is 15KN in working situation;

6 levels of working platform provide oriented space for formwork operation, reinforcement installation, concrete pouring and finishing repair etc.

 

Applications projects

 

Modular Automatic Climbing Formwork , Auto Climbing System For High Rise Building 1

 


Our Services


1. Analysis from bidding invitation stage and provide professional advice, consultation and formwork suggestion.
2. Provide formwork preliminary design, refining initial plan, and exploring relation limitation between supply&demand.
3. Choose a best propasal to help our clients to bid for the project.
4. Start to devise the formwork detailedly according to the winning bidding.
5. Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris