
Safety Construction Handrails And Construction Work Platforms Steel Boards
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 1000m | Price : | $18/m |
---|---|---|---|
Packaging Details : | Pallet | Delivery Time : | 20 Work days |
Payment Terms : | L/C, T/T | Supply Ability : | 1000000m/Year |
Place of Origin: | Shanghai | Brand Name: | ForPro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | H50 & H45 |
Detail Information |
|||
Material: | Q235 Steel Q195 | Color: | Silver,Customize, Hot Galvanize |
---|---|---|---|
Brand Name: | ForPro | Packing: | Steel Pallet |
High Light: | safe working platform,safety platform systems |
Product Description
Hot Galvanized Light weight Steel Boards Apllied as Reliable and Economical Platform
Description
As a new developed platform product, the steel platform is produced with hot galvanied steel plate, after hole punching, plate bending and welding, the final steel platform has a advantage of light weight, strong rigidity, good corrosion resistance and long service time. Compare to traditional wood plank, this platform board is even more light, but its reuse time can reach to more than 200 times.It is widely applied in walkway and platform in construction industry, it is the best alternative to traditional wooden planks.
Product specification
Width: 240, 250mm,300mm
Height: 45mm, 50mm
Length: 0.5m to 6m, specific length can be customize-made
Thickness of steel plate: 1.2mm, 1.5mm, 1.8mm,2mm
Unit weight: 3m to 6.5kg/m
Advantage of steel board
• High safety due to professional steel production .
• High rigidity due to steel raw material and bended C section
• Anti-skid property due to uneven punching holes
• High anti-corrosion and long service life due to surface treatment with hot-galvanize
• Fire proof due to steel material
• Easy operation due to light weight
• Standard product save costs of transportation and storage
Application
• Climbing formwork working platform
• Scaffolding working platform
• Walkway with scaffolding tubes
• Passage on the jobsite
Enter Your Message