Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

NPP Project Crane Climbing Formwork Safe Operation With 1.6 Main Platform

Minimum Order Quantity : 100 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 100000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Tank construction climbing formwork F16 system

Detail Information

Material: Q235 Steel, H20 ,Plywood,steel Frame Color: Bright Yellow,Hot-galvanize,Brown,Silver
Size: Platform Width 1600mm Application: Nuclear Power Point,Silo, LNG Tank, Shiplock, High Piers
Product Name: F16 Climbing Formwork Type: Climbing Formwork,Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
High Light:

crane climbing formwork

,

self climbing scaffold system

Product Description

F16 Climbing Formwork System for LNG Tank and NPP and Testing Tower Project

 

Description

Climbing formwork F16 is a project-proven modular and low weightest climbing formwork system. It is lifted by crane and can be fast repositioned to new casting step. With only 3 main components, it is a cost-efficient climbing formwork system and can be assemled quickly. Formwork can be moved back from concrete surface 700mm and leave enough space for formwork cleaning and reinforcement installation. Embedded tie rod with high strength will tansfer all load to the concrete structure.The whole climbing formwotj is popular applied in LNG tank, Nuclear power plant project, silo project and high piers etc.

 

Main parts
ForPro large-sized k timber beam H20 formwork panel

• Light-weighted F16 brackets

Diagonal cross spindle 

• 3 levels platform 

 

Advantage
• Combination of forming wood and timber beam, any shape and any radius tank projects can be adapted.

• Economical main Platform is 1.60 wide for safe operation

• Light weight and simple parts means less labour costs and crane costs

• Very few components means easy tansportation and stock management

 

Technical parameter

• Min.required concrete strength in anchor point is 15kN

• Max.permissible vertical load is 45KN per bracket 

Main platform width: 1.60m

 

Applications Field

• Liquid nature gas tank

• Industrial shearing wall

• Piers 

• Nuclear power plant projects

• Silo projects

 

NPP Project Crane Climbing Formwork Safe Operation With 1.6 Main Platform 0NPP Project Crane Climbing Formwork Safe Operation With 1.6 Main Platform 1

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris