Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

Minimum Order Quantity : 20 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 1000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Modular climbing formwork system

Detail Information

Material: Q235 Steel, Timber Beam,Plywood Color: Yellow
Size: 50KN Per Bracket Application: High Verticle Structure, Shiplock, Pylon Legs, High Piers
Product Name: Jump Form Formwork CF240 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
Name: Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop Certification: CE/ SGS,ISO
High Light:

2.4m Wide Platform Jump Form Formwork

,

Hot Galvanizing Jump Form Formwork

Product Description

 

Hot Galvanizing Main Platform 2.4m Wide Jump Form Formwork

 

 

Description

 

Since the formwork can climb by itself and does not require lifting and transporting machinery, the lifting workload of the lifting and transporting machinery in the construction of high-rise buildings is reduced, and the large formwork can be prevented from stopping due to the influence of strong wind. Since scaffolds are hung on the self-climbing formwork, the external scaffolding in the construction stage of the structure is also omitted, because it can reduce the number of cranes and speed up the construction speed, which has better economic benefits.

Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

 

Features
• Main Platform is 2.40 wide for safe operation

• Formwork 650mm retraction space for easy cleaning 

• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150

• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.

 

Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.


Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.


economic
The use of external power to upgrade and the use of a three-tier platform has greatly reduced costs.


Beautiful
For your project's own professional template scheme, standard products and standard colors, you can be impeccable in the visual impact of technical solutions and product use.


Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).

 

Climbing Formwork Installation Process

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork 0

 

Applications Field

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork 1

 

 

Factory

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork 2

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork 3

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris