Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 1000 Pcs / year |
Place of Origin: | shanghai | Brand Name: | Forpro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Modular climbing formwork system |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Blue, Yellow |
---|---|---|---|
Size: | 50KN Per Bracket | Application: | High Verticle Structure, Shiplock, Pylon Legs, High Piers |
Product Name: | Jumping Formwork System CF240 System | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
High Light: | Platform Width 2.4m Jumping Formwork System,Multi Layer Jumping Formwork System |
Product Description
Main Platform 2.4 Wide For Safe Operation Jumping Formwork System
Description
Climbing form construction is a kind of multi-layer functional frame climbing technology that meets the requirements of over form construction, which greatly simplifies the construction process of high piers. By simplifying the construction process and improving the construction efficiency, the purpose of shortening the construction period is realized. The climbing formwork construction method not only saves construction materials, the construction speed is fast, but also the concrete surface is smooth and beautiful. It is currently the most advantageous construction method in the construction of high piers.
Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork
• Climbing brackets incude horzontal profile and verticel profile
• Panel travelling unit can trave formwork 650mm away from concrete
• Anchoring system D20.0 with high loadability
Features
• Main Platform is 2.40 wide for safe operation
• Formwork 650mm retraction space for easy cleaning
• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150
• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.
Climbing Formwork Installation Process
Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.
Applications Field
Forpro Service
Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.
3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.
Enter Your Message