Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

CF240 Jump Formwork System

Minimum Order Quantity : 20 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 1000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Modular climbing formwork system

Detail Information

Material: Q235 Steel, Timber Beam,Plywood Color: Blue, Yellow
Size: 50KN Per Bracket Application: High Verticle Structure, Shiplock, Pylon Legs, High Piers
Product Name: Climbing Formwork CF240 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
Name: Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop Certification: SGS,ISO,CE
High Light:

Hydraulic Jump Formwork System

,

Automatic Jump Formwork System

,

Hot Galvanizing Jump Formwork

Product Description

Hot Galvanizing Automatic Hydraulic Jump Formwork System

 

 

Description

As a high load bearing capacity, climbing formwork can be widely utilized in various projects as high piers, abutment, elevator testing tower and high-rise structures. it is designed for precise and convienient operation for all high-rise projects, 2.40m wide platform in comibination movable formwork unit ensure speedy and safe formwork operation. Multi level platforms  provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.
 

Features
• Main Platform is 2.40 wide for safe operation

• Formwork 650mm retraction space for easy cleaning 

• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150

• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.

 

Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.


Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.


Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).

 

Climbing Formwork Installation Process

CF240 Jump Formwork System 0

 

Applications Field

CF240 Jump Formwork System 1

 

Forpro Service

Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.

3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.

 

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris