Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 1000 Pcs / year |
Place of Origin: | shanghai | Brand Name: | Forpro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Modular climbing formwork system |
Detail Information |
|||
Size: | 50KN Per Bracket | Application: | High Verticle Structure, Shiplock, Pylon Legs, High Piers |
---|---|---|---|
Product Name: | Jump Form Formwork CF240 System | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
Name: | Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop | Certification: | CE/ SGS,ISO |
High Light: | Modular Jump Formwork,Automatic Hydraulic Jump Formwork,2.4m Width Platform Jump Formwork System |
Product Description
2.4m Wide Platform Jump Formwork with Hot Galvanizd And Automatic Hydraulic System
Outline
Climbing formwork construction takes pouring reinforced concrete as an important supporting body. The formwork is closely attached to the concrete. The upper formwork is supported by the adhesion and friction of the concrete on the lower formwork. The sag, flatness and curvature are easy to adjust and control. To avoid the accumulation of construction errors, the design is reasonable, the template does not occupy the construction site, and can be recycled without configuring too many quantities.
Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork
• Climbing brackets incude horzontal profile and verticel profile
• Panel travelling unit can trave formwork 650mm away from concrete
• Anchoring system D20.0 with high loadability
Technical Specification
• Main platform width up to 2.2m, provides sufficient space for workers
• Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
• 3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.
Applications Field
Enter Your Message