Product Details:
|
|
Place of Origin: | shanghai |
---|---|
Brand Name: | Forpro |
Certification: | ISO and CE |
Model Number: | Modular climbing formwork system |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 20 pcs |
Price: | $3900-4500/pcs |
Packaging Details: | Pallet |
Delivery Time: | 30-45 work days |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 Pcs / year |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Blue, Yellow |
---|---|---|---|
Size: | 50KN Per Bracket | Application: | High Verticle Structure, Shiplock, Pylon Legs, High Piers |
Product Name: | Jumping Formwork System CF240 System | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
High Light: | 2.4 m Platform Jumping Formwork System,Automatic Hydraulic System Jumping Formwork System |
Product Description
Description
Since the formwork can climb by itself and does not require lifting and transporting machinery, the lifting workload of the lifting and transporting machinery in the construction of high-rise buildings is reduced, and the large formwork can be prevented from stopping due to the influence of strong wind. Since scaffolds are hung on the self-
climbing formwork, the external scaffolding in the construction stage of the structure is also omitted, because it can reduce the number of cranes and speed up the construction speed, which has better economic benefits.
Features
• Main Platform is 2.40 wide for safe operation
• Formwork 650mm retraction space for easy cleaning
• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150
• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.
Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork
• Climbing brackets incude horzontal profile and verticel profile
• Panel travelling unit can trave formwork 650mm away from concrete
• Anchoring system D20.0 with high loadability
Diverse product choices
• You can choose the appropriate plywood according to the number of turnovers.
• Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
• According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).
Climbing Formwork Installation Process
Safety
• The embedded system uses special high-specification embedded parts.
• The main general steel components are made of hot-dip zinc.
• Platforms at all levels and external protection adopt rigid protection technology.
Applications Field
FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.
Q 2.Do you have strong techinicans teams?
Yes,We have 9 project designers, 4 product development engineers and 10 technical guidance engineers. The whole team has more than 20 years of engineering experience
Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.
Q 4. What is your production capacity?
3000Tons per month.
Q 5. Do you have test report?
Yes, all of our products get the famous German Rhine certifications.
Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.
Enter Your Message