Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Column And Wall Timber Beam Formwork Efficient For Building Construction

Minimum Order Quantity : 100 Squ Packaging Details : Pallet
Delivery Time : 15-20 work days Payment Terms : L/C, T/T
Supply Ability : 1000000 Sqm / year
Place of Origin: shanghai Brand Name: ForPro
Certification: ISO and CE Model Number: customized

Detail Information

Features: Simple And Efficient Operation Material: Q235 Steel, Timber Beam,Plywood
Color: Yellow,Blue,Black Size: Customized
Product Name: Environmental Building Column Formwork Aluminium Alloy Formwork, Steel Column Formwork, Aluminum Formwork Construction Material, Aluminum Formwork System Concrete Forming System Concrete Formwork, Aluminium Adjustable Column Formwork Application: Concrete Construction, Wall And Column Concrete Construction
High Light:

column forms for concrete

,

system column formwork

Product Description

Timber Beam Column and Wall Formwork for Building Construction with High Efficiency

 

Outline

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall and column formwork units when a frequent change of the building structure plans happens.

Column And Wall Timber Beam Formwork Efficient For Building Construction 0

Technical Specification
The steel waling of standard adjustable column formwork has three specifications. This can satisfy the need of concreting of column with waling length from 200mm to 1200mm.

The length of steel waling(mm) The side length of column(mm)
1500 & 1800 800~1200
1500 & 1200 400~800
1200 & 900 200~400

 

Advantages
1. Can create any shape and size of wall and column formwork with any thickness.
2. Can choose whichever form face material best meets your requirements - e. G. For smooth fair-faced concrete.
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials.
4. Can be pre-assembled on your site or before arrival at your site, saving time, cost and space for you.
5. Can match well with most Euro formwork systems.

 

Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Applications

Column And Wall Timber Beam Formwork Efficient For Building Construction 1

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris