Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Multi Layer Platform Width 2.4m Jumping Formwork System With Automatic Hydraulic System

Minimum Order Quantity : 20 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 1000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Modular climbing formwork system

Detail Information

Material: Q235 Steel, Timber Beam,Plywood Color: Blue, Yellow
Size: 50KN Per Bracket Application: High Verticle Structure, Shiplock, Pylon Legs, High Piers
Product Name: Jumping Formwork System CF240 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
High Light:

Platform Width 2.4m Jumping Formwork System

,

Multi Layer Jumping Formwork System

Product Description

 

Main Platform 2.4 Wide For Safe Operation Jumping Formwork System

 

 

Description


Climbing form construction is a kind of multi-layer functional frame climbing technology that meets the requirements of over form construction, which greatly simplifies the construction process of high piers. By simplifying the construction process and improving the construction efficiency, the purpose of shortening the construction period is realized. The climbing formwork construction method not only saves construction materials, the construction speed is fast, but also the concrete surface is smooth and beautiful. It is currently the most advantageous construction method in the construction of high piers.


Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

 

Features
• Main Platform is 2.40 wide for safe operation

• Formwork 650mm retraction space for easy cleaning 

• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150

• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.

 

Climbing Formwork Installation Process

Multi Layer Platform Width 2.4m Jumping Formwork System With Automatic Hydraulic System 0

 

Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.

 

Applications Field

Multi Layer Platform Width 2.4m Jumping Formwork System With Automatic Hydraulic System 1

 

Multi Layer Platform Width 2.4m Jumping Formwork System With Automatic Hydraulic System 2

Forpro Service

Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.

3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris