
Light Weight 6061-T6 Aluminium Formwork System With High Efficiency
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 500 sqm | Price : | $120-140 / M2 |
---|---|---|---|
Packaging Details : | Pallet | Delivery Time : | 30-45 Work days |
Payment Terms : | L/C, T/T | Supply Ability : | 100000 M2 / Year |
Place of Origin: | Shanghai | Brand Name: | ForPro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Aluminium Formwork |
Detail Information |
|||
Material: | 6061-T6 Aluminum | Application: | Concrete Construction,formwork,tall Building/sairport/towers/) |
---|---|---|---|
Size: | 100L/200L/300L/400L | Product Name: | Aluminum Template Formwork,6061 T6 Aluminium Formwork,6061-T6 Aluminium Construction Formwork System |
Color: | Silver | Type: | Wall Form,Formwork |
Weight: | 20-28kg/sqm | Advantages: | Light Weight,high Strength |
Service: | Design & OEM Service | Price: | Contact Us |
High Light: | aluminium system formwork,aluminium wall formwork |
Product Description
Easy Disassembly Construction Aluminum Template Formwork Series
Outline
Building aluminum formwork as a new type of building formwork system is popular applicated in molonithic construction methos recent years, more and more housing projects all around the world is deveoping aluminum formwork applications.
Aluminum Formwork | |
Raw material | 6061-T6 Aluminium alloy |
Main Components | Beam,column and wall formwork,Prop,Others |
Concreting pressure | 60kN/m2 |
Formwork dimension | Non-standard: custom-made as per buy’s requirements |
Production capacity | 20000 sqm per month |
Applications | Residential housing |
Core of high-rise building | |
Column or shearing wall |
Advantages of aluminum template
1.The construction efficiency is high and the cycle is short, convenient construction, repeatability, ease of use, and low cost.
2.It has well stability and high bearing capacity, Carrying capacity can reach 60kN per square meter.
3.It also has a wide application scope, Aluminum formwork system is applicable to all building components.
4.Good effect of concrete surface after removal the formwork.Post treatment of plastering is no need.
5.Less construction waste is produced.
6.Pre-design of a formwork with high precision and practical.Very suitable for the standard layer of high-rise buildings.
7.Aluminum alloy material is recycled,All materials are energy saving, environmental protection, low carbon, emission reduction.
8.Less shoring props,Wide work space is available and easy to walk through.
Porduct Detail
Applications
FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.
Q 2.Do you have strong techinicans teams?
Yes,We have 9 project designers, 4 product development engineers and 10 technical guidance engineers. The whole team has more than 20 years of engineering experience
Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.
Q 4. What is your production capacity?
3000Tons per month.
Q 5. Do you have test report?
Yes, we have done many test by TUV Rheinland(Shanghai) Co.,Ltd.
Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.
Enter Your Message