Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 10000 pcs / year |
Place of Origin: | shanghai | Brand Name: | ForPro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | CF220 |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Yellow,Blue,Black |
---|---|---|---|
Size: | Customized | Application: | Concrete Construction, Building Construction, Wall And Column Concrete Construction, Pier,Bridge,Super High-rise Building Etc |
Product Name: | Hot Sale Sturdy Long Lasting , Peri Wall Formwork System, H20 Beam H20 Wooden Beam Formwork H20 Bimber Team, High Recycling Value Climbing Formwork With Factory Price, Concrete Steel Formwork | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
Advantage: | Easly Removable, Easy Operation Quick Climbing And High Saftly Coefficient | Feature: | Light Weight, One-time Pouring, Fast Assembly & Positioning, Reuses |
High Light: | climbing scaffolding system,self climbing scaffold system |
Product Description
CF220 Climbing Formwork System Concrete Climbing Scaffolding Formwork
Outline
CF220 is a crane lifted climbling formwork which is mainly designed for high concrete wall structure, formwork and plateform can be integrity moved to next position with just one lift.It also provides multi-level platforms which make your site work much safer & easier .
Component
• ForPro Formwork System: Timber Beam, Steel Waler, Waler Clamp, Lifting Bracket.
• Climbing Brackets: Horizontal Bracket, Diagonal Strut, Vertical Waling, Travelling unit, Waler Hook Bolt.
• Anchoring System: Climbing Cone, Position Cone, Position Disc, High Strength Screw, Embedded Anchor.
Technical Specification
• Main platform width up to 2.2m, provides sufficient space for workers
• Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
• 3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.
Features
• Formwork panel can be retracted back 60cm from the concrete wall
• Formwork panels and climbing brackets are preassembled one time and can be reused many times
• CF220 climbing formwork is safely anchored on concrete structure during whole working procedure
• One climbing unit will only lost 2 embedded anchors each casting step (one unit is composed of 2 climbing brackets).
• Plywood could possible to be reused 30 times under properly operation.
Product Sketches
The Formwork Operation Process
Applications
Enter Your Message