Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

Minimum Order Quantity : 60 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 10000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Heavy duty climbing formwork system

Detail Information

Material: Q235 Steel, Bended Profile,steel Panel Color: Blue Lacquer, Brown, Light Yellow
Size: 220KN Per Bracket Application: Massive Concrete, Dam, Power Station, Shiplock, Bridge Abutment
Product Name: Dam Climbing Formwork DF220 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
High Light:

crane climbing formwork

,

self climbing scaffold system

Product Description

Dam Climbing Formwork for Dam and Bridge Abutment Construction Speedy

 

Description

As a high load bearing capacity and safety climbing formwork, Dam formwork D20 is  widely utilized in various massive concrete projects as dam, abutment, coffer dam, shiplock and power station house projects. it is specially designed for projects where through-in tie rod could not be applied to fix opposite formwork, and all concrete pressure will be beared by climbing brackets.  1.70m wide platform in comibination with title back formwork unit ensure speedy and safe operation. Multi level platforms  provide orient work space for formwork operation, concrete pouring and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination within 300.

Elements
• Title back formwork unit could be timber beam large size formwork or steel formwork 

• Triangle brackets bearing concrete pressure

• Panel travelling unit is option if reinforcement installation space is required

• Anchoring system 20.0 with high loadability

 

Features
•Main pPlatform is 1.70 m wide for safe operation

• Formwork is title back or 600mm retraction space is also possible 

• 3 levels of platform provide space for concrete pouring, formwork operation and concrete surface repairing

• Max. permitted pull force is 200kN per bracket for embedded tie rod

 

Climbing Formwork Installation Process

 

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction 0

 

Packing

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction 1

 

Applications Field

 

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction 2

 

FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.

Q 2.Do you have strong techinicans teams?
Yes,We have 23 technical engineers with more than 20 years experience

Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.

Q 4. What is your production capacity?
3000Tons per month.

Q 5. Do you have test report?
Yes, we have done many test by TUV Rheinland(Shanghai) Co.,Ltd.

Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris