FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

Automatic Hydraulic Jump Formwork System For Tunnel

Product Details:
Place of Origin: shanghai
Brand Name: Forpro
Certification: ISO and CE
Model Number: Modular climbing formwork system
Payment & Shipping Terms:
Minimum Order Quantity: 20 pcs
Price: $3900-4500/pcs
Packaging Details: Pallet
Delivery Time: 30-45 work days
Payment Terms: L/C, T/T
Supply Ability: 1000 Pcs / year
  • Detail Information
  • Product Description

Detail Information

Size: 50KN Per Bracket Application: High Verticle Structure, Shiplock, Pylon Legs, High Piers
Product Name: Jump Form Formwork CF240 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
Name: Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop Certification: CE/ SGS,ISO
High Light:

Automatic Hydraulic Jump Formwork System

,

Tunnel Jump Formwork System

,

Tunnel Jump Form Formwork

Product Description

Jump Formwork System With Automatic Hydraulic System & 2.4m Wide Platform

 

 

Outline


Climbing formwork construction takes pouring reinforced concrete as an important supporting body. The formwork is closely attached to the concrete. The upper formwork is supported by the adhesion and friction of the concrete on the lower formwork. The sag, flatness and curvature are easy to adjust and control. To avoid the accumulation of construction errors, the design is reasonable, the template does not occupy the construction site, and can be recycled without configuring too many quantities.


Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

 

Technical Specification

Main platform width up to 2.2m, provides sufficient space for workers
Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.

 

Applications Field

Automatic Hydraulic Jump Formwork System For Tunnel 0

 

 

Automatic Hydraulic Jump Formwork System For Tunnel 1

 

 

Get in touch with us

Enter Your Message

You Might Be Into These