  • Detail Information
  • Product Description

Detail Information

Material: Q235 Steel, Timber Beam,Plywood Color: Yellow,Blue,Black
Size: Customized Application: Building Construction, Wall And Column Concrete Construction, Pier,Bridge,Super High-rise Building Etc
Product Name: Concrete Steel Formwork Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
High Light:

climbing scaffolding system

,

self climbing scaffold system

Product Description

High Efficiency CF220 Climbing Formwork for Core Wall and Bridge Concrete

 

Description

Climbing Formwork CF220 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 6.0 m.

Component
Platform width: 2.2m
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet siterequirement.
Main platform: provide workers a safe working platform.
Safety lader:used for workers up and dow
n.


Features
* Formwork panel can be retracted back 60cm from the concrete wall
* Formwork panels and climbing brackets are preassembled one time and can be reused many times.
* CF220 climbing formwork is safely anchored on concrete structure formwork adjustment and surface repair.
* One climbing unit will only consume 2 anchors each casting step (one unit is composed of 2 climbingbrackets), and plywood could possible to be reused 30 times with properly operation.

 

The Concrete Pouring Process

High Efficiency Climbing Scaffold System For Core Wall And Bridge Concrete 0

 

Applications

 

High Efficiency Climbing Scaffold System For Core Wall And Bridge Concrete 1High Efficiency Climbing Scaffold System For Core Wall And Bridge Concrete 2

 

Get in touch with us

Enter Your Message

You Might Be Into These