Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 Pin | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 10000 PIn / year |
Place of Origin: | shanghai | Brand Name: | ForPro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | customized |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Yellow,Blue,Black |
---|---|---|---|
Size: | Customized | Application: | Building Construction, Wall And Column Concrete Construction, Pier,Bridge,Super High-rise Building Etc |
Product Name: | Concrete Steel Formwork | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
High Light: | climbing scaffolding system,self climbing scaffold system |
Product Description
High Efficiency CF220 Climbing Formwork for Core Wall and Bridge Concrete
Description
Climbing Formwork CF220 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 6.0 m.
Component
Platform width: 2.2m
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet siterequirement.
Main platform: provide workers a safe working platform.
Safety lader:used for workers up and down.
Features
* Formwork panel can be retracted back 60cm from the concrete wall
* Formwork panels and climbing brackets are preassembled one time and can be reused many times.
* CF220 climbing formwork is safely anchored on concrete structure formwork adjustment and surface repair.
* One climbing unit will only consume 2 anchors each casting step (one unit is composed of 2 climbingbrackets), and plywood could possible to be reused 30 times with properly operation.
The Concrete Pouring Process
Applications
Enter Your Message