
Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 100 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 10000 Pcs / year |
Place of Origin: | shanghai | Brand Name: | Forpro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Slip climbing formwork system |
Detail Information |
|||
Material: | Q235 Steel, Cylinder, Wooden Plank | Color: | Blue Lacquer, Brown, Light Green,yellow |
---|---|---|---|
Size: | 2m To 3m Per Day Climbing Speed | Application: | Silo, Cooling Tower,TV Tower,cement Plant, Raw Meal Silo, Testing Tower,chimney |
Product Name: | Slip Climbing Formwork CSF150 System | Type: | Climbing Formwork,Wall Formwork, Steel Formwork,Silo Formwork,Climbing Formwork |
High Light: | crane climbing formwork,self climbing scaffold system |
Product Description
Slip Climbing Formwork System for Continous Construction of High Silo and Cooling Tower
Product definition
Slip formwork is a climbing formwork specially designed for continous concreting along all height, Formwork and platform is drived upword by hydraulic equipment, It's operation is indenpent of crane and weather. The slip climbing formwork is widely used in silo, cooling tower, chimney and tank projects. Standard climbing height each step is approx.1m, and formwok will be climbed up while concrete strength to 0.2 to 0.4Mpa.As a non-stop concreting climbing formwork , there is no horizontal concrete joint need to be treated on the jobsite and much time is saved. 2 group of workers need to be available for 24 hours's concreting per day. Enclosed handrail protection and platform is equiped and provide high safety enviroment for jobsite workers . 1.50m width of main platform and 0.85m width of suspension platform ensure speedy and safe formwork operation. Multi level platforms provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process.
Components
• External and internal operation platform
• External and internal suspension platform
• Slip standard formwork
• Hydraulic cylinder and hydraulic unit and hydraulic line
• Adjustable lifting brackets
Advantage and Installation procedure
• High efficiency and short construction period due to continuous concreting and no treatment of horizontal concrete joint
• Better concrete surface due to no construction joint during whole process
• High safety due to closed platform and handrail housing
• Universal components and could be reused to next projects
• Low costs
Applications Field
Enter Your Message