Lightweight Safety Climbing Formwork System F16 For High - Rise Building
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 20 pcs | Packaging Details : | Pallet |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, T/T |
Supply Ability : | 1000 Pcs / year |
Place of Origin: | shanghai | Brand Name: | Forpro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Modular climbing formwork system |
Detail Information |
|||
Material: | Q235 Steel, Timber Beam,Plywood | Color: | Blue, Yellow |
---|---|---|---|
Size: | 50KN Per Bracket | Application: | High Verticle Structure, Shiplock, Pylon Legs, High Piers |
Product Name: | Climbing Formwork CF240 System | Type: | Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork |
Name: | Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop | Certification: | SGS,ISO,CE |
High Light: | Hot Galvanizing Climbing Formwork System,2.40m Wide Platform Climbing Formwork System |
Product Description
Hot Galvanizing Climbing Formwork System Main Platform 2.4m Wide
Description
As a high load bearing capacity, climbing formwork can be widely utilized in various projects as high piers, abutment, elevator testing tower and high-rise structures. it is designed for precise and convienient operation for all high-rise projects, 2.40m wide platform in comibination movable formwork unit ensure speedy and safe formwork operation. Multi level platforms provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.
Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.
Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.
economic
The use of external power to upgrade and the use of a three-tier platform has greatly reduced costs.
Beautiful
For your project's own professional template scheme, standard products and standard colors, you can be impeccable in the visual impact of technical solutions and product use.
Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).
Climbing Formwork Installation Process
Applications Field
Forpro Service
Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.
3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.
Enter Your Message