Light Weight Steel Shuttering Plates , Concrete Wall Forming Systems
Contact Person : Liu
Phone Number : 86-18011399169
WhatsApp : +8618280345525
Minimum Order Quantity : | 100 sqm | Price : | $100-150/Sqm |
---|---|---|---|
Packaging Details : | Pallet | Delivery Time : | 15-20 work days |
Payment Terms : | L/C, T/T | Supply Ability : | 1000000 Sqm / Year |
Place of Origin: | Shanghai | Brand Name: | ForPro |
---|---|---|---|
Certification: | ISO and CE | Model Number: | Customized |
Detail Information |
|||
Material: | Hot Galvanizing Steel And Plywood | Color: | Yellow |
---|---|---|---|
Application: | High-rise Building/ Bridge Tower/ Nuclear Project Etc.. | Name: | Concrete Formwork,lager Size Formwork,Top50 Formwork |
Surface: | Painted,Galvanized,Easily Assembled, Reuses, Universal Forming Application, Eco Friendly, | Feature: | With Scaffold Bracket Equipped |
High Light: | Yellow Wall Formwork System,High Rise Building Wall Formwork System |
Product Description
Hot galvanizing Steel and Plywood wall Formwork Systems
Wall formwork components
Components | Description |
Wall formwork panel | Plywood thickness is 15mm,18mm & 21mm, Max dimension is 2mx6m (Customized size) |
H20 Timber beam | Water proof treated;Height: 200mm;Width: 80mm;Length: as per table size |
Steel waling | Double steel channel |
Flange clamp | Galvanized To connect steel waling and H20 beams |
Panel strut | Painted |
Waling connector | Painted, Used for formwork panels alignment |
Corner connector | Painted, Used for forming inner corner formwork with wedge pins |
Scaffold bracket | Painted,severs as safety working platform |
Product Description
Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas' formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality.
The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used
to reinforce the corner
Applications
FAQ
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q4. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q5. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q6. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q7. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.
Enter Your Message