Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

LNG Tower Galvanized Jump Form System With Crane Lifted

Minimum Order Quantity : 20 Pin Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 10000 PIn / year
Place of Origin: shanghai Brand Name: ForPro
Certification: ISO and CE Model Number: customized

Detail Information

Material: Q235 Steel, Timber Beam,Plywood Color: Yellow,Blue,Black
Size: Maximum Formwork Height Of Up To 6.0 M Application: Building Construction, Wall And Column Concrete Construction, Pier,Bridge,Super High-rise Building Etc
Product Name: Jump Form System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
Surface: Galvanized Sample: Welcome,Free
High Light:

Galvanized Jump Form System

,

LNG Tower Jump Form System

Product Description

 

LNG Tower Jump Form System With Crane Lifted ISO CE Certificate

 

 

Description

 

It is composed of climbing formwork, climbing frame (some climbing formwork without climbing frame) and climbing equipment. It is an effective tool in the construction of high-rise structures such as shear wall system, cylinder system and bridge pier. Due to the self-climbing ability, there is no need for lifting machinery, which reduces the lifting workload of transport machinery during construction. Hanging the scaffolding on the self-climbing formwork can save the external scaffolding during construction. In summary, the climbing formwork can reduce the number of cranes and speed up the construction speed, so the economic benefits are better.

Features


* Formwork panel can be retracted back 60cm from the concrete wall
* Formwork panels and climbing brackets are pre-assembled one time and can be reused many times.
* CF220 climbing formwork is safely anchored on concrete structure during formwork adjustment and concreste surface repairment.

LNG Tower Galvanized Jump Form System With Crane Lifted 0

 

The Concrete Pouring Process

LNG Tower Galvanized Jump Form System With Crane Lifted 1

 

Applications

 

LNG Tower Galvanized Jump Form System With Crane Lifted 2

 

Factory

 

LNG Tower Galvanized Jump Form System With Crane Lifted 3

LNG Tower Galvanized Jump Form System With Crane Lifted 4

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris