Contact Us

Contact Person : Liu

Phone Number : 86-18011399169

WhatsApp : +8618280345525

Free call

Hydraulic 2.4m Width Platform Hot Galvanized Jump Form Formwork

Minimum Order Quantity : 20 pcs Packaging Details : Pallet
Delivery Time : 30-45 work days Payment Terms : L/C, T/T
Supply Ability : 1000 Pcs / year
Place of Origin: shanghai Brand Name: Forpro
Certification: ISO and CE Model Number: Modular climbing formwork system

Detail Information

Size: 50KN Per Bracket Application: High Verticle Structure, Shiplock, Pylon Legs, High Piers
Product Name: Jump Form Formwork CF240 System Type: Wall Formwork, Steel Formwork,Column Formwork,Climbing Formwork
Name: Concorete Formwork,formwork System For High Buidling/Bridges/dam/pier/tunnel/workshop Certification: CE/ SGS,ISO
High Light:

Hot Galvanized Jump Form Formwork

,

2.4m Width Platform Jump Form Formwork

,

Hydraulic Jump Formwork

Product Description

2.4m Wide Platform Jump Formwork with Hot Galvanizd And Automatic Hydraulic System

 

 

Outline


Climbing formwork construction takes pouring reinforced concrete as an important supporting body. The formwork is closely attached to the concrete. The upper formwork is supported by the adhesion and friction of the concrete on the lower formwork. The sag, flatness and curvature are easy to adjust and control. To avoid the accumulation of construction errors, the design is reasonable, the template does not occupy the construction site, and can be recycled without configuring too many quantities.

 

Description

Main platform width up to 2.2m, provides sufficient space for workers
Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.


Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability


Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.


economic
The use of external power to upgrade and the use of a three-tier platform has greatly reduced costs.

 

Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).

 

Applications Field

Hydraulic 2.4m Width Platform Hot Galvanized Jump Form Formwork 0

 

 

 

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Amber.Lin@forpro.com.cn
+8618280345525
8618011399169
shinenic.doris